Category: Hull, Deck Work
Maintenance/Repair Details:
Week 1: Boat lifted at Allington Marina for her annual service, anti-fouling and anode replacement. During the first week she was washed down, polished and rubbing band sanded and re-varnished. New coat of anti-foul applied. New magnesium anodes fitted as we intend on staying at Allington in fresh water.
Week 2: Area of the saloon roof which were chipped or worn away rubbed down and repainted, chrome work cleaned and fenders cleaned (removed old fender socks). General clean of interior and carpets.
Sunday, 13 September 2020
Tuesday, 9 June 2020
5th June 2020
Category: Hull
Maintenance/Repair Details:
Following 6 months without use due to winter lay-up and Covid19 lockdown we have carried out an underwater hull check on anodes and props.
All appears O.K and in order.
Parts and/or Items Used: Nil.
Maintenance/Repair Details:
Following 6 months without use due to winter lay-up and Covid19 lockdown we have carried out an underwater hull check on anodes and props.
All appears O.K and in order.
Parts and/or Items Used: Nil.
Wednesday, 27 May 2020
17th May 2020
Category: Fixtures & Fittings
Maintenance/Repair Details:
Fitted the new summer canopy made for us by our mooring neighbour. Very light nylon canopy of a different design to the standard canopy, new zip position and much larger window.
Old canopy sent away to be renovated ready to be fitted during the winter months.
Parts and/or Items Used: Canopy
Maintenance/Repair Details:
Fitted the new summer canopy made for us by our mooring neighbour. Very light nylon canopy of a different design to the standard canopy, new zip position and much larger window.
Old canopy sent away to be renovated ready to be fitted during the winter months.
Parts and/or Items Used: Canopy
Saturday, 16 May 2020
15th May 2020
Category: Engines,
Electrics, Fixtures & Fittings, Stern Glans
Maintenance/Repair
Details:
Not so much as a maintenance log more of a record of being able to
return to the boat after almost 10 weeks away, due to CoVid19 virus and the
national lockdown. The last time the boat was last started and used was way
back in November 2019. That means she has laid dormant for almost 7 months.
Today we can visit her and do all necessary maintenance checks, in
the last 10 weeks the marina has been out of bounds and inaccessible, although
we are still not able to put to sea or on the river.
I am delighted to say that due to early mechanical servicing at
the end of the last season the boat is in excellent condition, a little dusty
inside but on checking the engines, stern glands, bilges, electrical and gas
systems, she is in fine condition. Obviously, the batteries need a good charge,
which we have started on our first visit and will continue when we return after
the weekend.
Parts
and/or Items Used: None
Tuesday, 5 November 2019
Date: 5 November 2019
Category:
Hull
Maintenance/Repair
Details: Following the recent service of both gearboxes I decided to
complete the work by cleaning and painting the engine bays of both engines. The
area was cleaned and degreased and a good coat of red bilge paint applied. An
oil mat was placed under the gearboxes, more for appearance that necessity.
Parts and/or Items Used: Bilge Paint
![]() |
| Stbd gearbox area. |
![]() |
| Port engine & gearbox with engine bay covers removed. |
Thursday, 31 October 2019
Thursday, 19 September 2019
19th September 2019
Caterogy: Engines
Maintenance/Repair Details:
Following our lift in and journey back to Chatham we identified a vibration on the port side propeller shaft. As such the double universal drive shaft from gearbox to plume bearing was removed cleaned and checked, as was all other bolts, fixtures & fittings on the port shaft. One thing highlighted by our resident engineer was the fact that the universal joint on each end may not have been alighted. Test cruise in the near future will answer that question.
Following our lift in and journey back to Chatham we identified a vibration on the port side propeller shaft. As such the double universal drive shaft from gearbox to plume bearing was removed cleaned and checked, as was all other bolts, fixtures & fittings on the port shaft. One thing highlighted by our resident engineer was the fact that the universal joint on each end may not have been alighted. Test cruise in the near future will answer that question.
Parts and/or Items Used:
Grease
Grease
Sunday, 15 September 2019
9th September 2019
Caterogy: Hull, Stern Glans
Maintenance/Repair Details:
Having been lifted out on Monday 9th September we carried out a few minor jobs before commencing anti-fouling today. First coat applied with the added extra on Extra Hot chilli powder. Also had the stern glans checked and tightened.
13th September - Adjusted stern glans and re-secured, restored aft cabin furniture. Refitted curtains & seat covers after having them cleaned. Reinflated fenders and replaced fender socks on damaged ones. Fitted new anodes. Polished hull.
15th September - Second coat of anti-foul applied. Saloon curtains & covers refitted. Boat made ready for lift-in.
Parts and/or Items Used:
Anti-fouled Paint, Other
Anti-fouled Paint, Other
Tuesday, 27 August 2019
21st August 2019
Category: Deck Work, Fixtures & Fittings
Maintenance/Repair Details:Started work today on recoating the deck paint only this time we are using a plastic coating in a lighter grey, hopefully this will avoid the issue of the rubber grip showing through and making the deck look constantly dirty.
Also removed the stern dodger and using fabric paint re-painted the name panel which had worn away over the years.

Day 2 - Re-coated the port side & stern deck.
Day 3 - Re-coated the starboard side.
Day 4 - Commenced repainting deck edging & hatch covers.
Day 5 - Completed the repaint of starboard side deck edging.
Day 6 - Finally completed deck work and snagging.
Footnote: temperature rising each day so by Day 6 air temperature around 32°.
Parts and/or Items Used:
Deck Paint, Other
Sunday, 9 June 2019
9th June 2019
Category: Deck Work,
Fixtures & Fittings
Maintenance/Repair Details:
Finally got round to installing 149mm midships mooring cleats on port & stbd sides. Secured with M8 x 100mm SS bolts on hard wood under deck blocks. This will greatly ease the job of mooring in windy conditions, especially in the lock.
Parts and/or Items Used:
146mm Cleats, Other
146mm Cleats, Other
Monday, 13 May 2019
12th May 2019
Category: Fixtures & Fittings
Maintenance/Repair Details: Continuation of wood restoration in the forward
cabin, spent two days stripping off old varnish on the gallery side then
re-stained and applied new coat of varnish. Just a small area to do around the
forward V berth area.
Tuesday, 7 May 2019
4th May 2019
Category: Engines, Electrics
Maintenance/Repair Details: Starboard engine failed to turn over today prior
to leaving for a weekend away. Investigated and found that the starter solenoid
had failed (later informed that probably due to worn starter motor brushes).
Located a replacement and fitted, test started O.K. Need to source starter
motor refurbishment dealer in the near future.
Parts and/or Items Used:
Starter Solenoid
Thursday, 18 April 2019
18th April 2019
Category: Fixtures & Fittings
Maintenance/Repair Details: Started restoration of interior woodwork, rubbed
down and restained the heads door and side wall. Applied Ronseal yacht varnish to finish off.
Parts and/or Items Used:
Saturday, 16 February 2019
15th February 2019
Category: Fuel, Engines, Cooling
System
Maintenance/Repair
Details: Continued with annual service on starboard engine.
- Changed engine oil
- Replaced fuel filters
- Installed new raw water impeller
- Run up and tested both engines.
Noted small
fuel leak on port engine filter, removed filter and disassembled replacing all
seals again. Reassembled and primed with no leak. Due to the strip down the
fuel system had to be completely reprimed leading to cracking all six
injectors.
Parts and/or Items Used:
Fuel Filters, Oil,
Replacement Parts
Thursday, 14 February 2019
13th February 2019
Category: Fuel, Engines
Maintenance/Repair
Details: Annual service on port engine,
- Changed engine oil & checked gearbox oil level.
- Fitted new fuel filters
- Renewed impeller on raw water pump.
- Run up and tested engine.
- When reassembling the engine panels and framework took the opportunity of fitting steel brackets to the joints for future added strength, being that the woodwork is now 50 years old.
Starboard engine service to follow.
Parts and/or Items Used:
Fuel Filters, Grease,
Oil, Replacement Parts
11th February 2019
Category: Fixtures &
Fittings
Maintenance/Repair
Details: Installed 2 new sleeping
berth mattresses.
Parts and/or Items Used: Furniture
Subscribe to:
Posts (Atom)











