Thursday 19 September 2019

19th September 2019

Caterogy: Engines

Maintenance/Repair Details:
Following our lift in and journey back to Chatham we identified a vibration on the port side propeller shaft. As such the double universal drive shaft from gearbox to plume bearing was removed cleaned and checked, as was all other bolts, fixtures & fittings on the port shaft. One thing highlighted by our resident engineer was the fact that the universal joint on each end may not have been alighted. Test cruise in the near future will answer that question.

Parts and/or Items Used:
Grease


Sunday 15 September 2019

9th September 2019

Caterogy: Hull, Stern Glans

Maintenance/Repair Details:
Having been lifted out on Monday 9th September we carried out a few minor jobs before commencing anti-fouling today. First coat applied with the added extra on Extra Hot chilli powder. Also had the stern glans checked and tightened.
13th September - Adjusted stern glans and re-secured, restored aft cabin furniture. Refitted curtains & seat covers after having them cleaned. Reinflated fenders and replaced fender socks on damaged ones. Fitted new anodes. Polished hull. 
15th September - Second coat of anti-foul applied. Saloon curtains & covers refitted. Boat made ready for lift-in.

Parts and/or Items Used:
Anti-fouled Paint, Other