Thursday 17 February 2022

Winter Work - Rubbing Band

Category: Woodwork (ongoing work), Hull

Maintenance/Repair Details: The plan being to remove all old varnish and staining of rubbing strake to reveal state of wood work and repair and renovate as necessary. 
Commenced work on renovating by removing all varnish and staining from the stbd side wooden rubbing band. Starboard side revealed several areas needing work. First coat of 10 year weather proofing applied.

17th February - Stripped transom rubbing band noting missing wooden bolt plugs and a small damaged area. First coat of 10 year weather proofing applied then a second coat applied to stbd and transom complete.
22nd February - Stripped port side of all old varnish and stain, replaced missing wooden plugs. Applied 2 coats of 10 year weather proofing to all vessel rubbing band.
23rd February - Applied a coat of yacht varnish to rubbing band. Measured, designed and cut from aluminium sheet 4 protector covers to protect the woodwork in the areas that our fenders hang and excess deck water runs off. Removed old anodes and cleaned contact areas.
26th February - Applied anti-foul to hull.

Parts and/or Items Used: 10 Year Wood Preserver, anti-foul

Work in progress on rubbing band.

Old varnish removed & applying weather shield.


One of the 4 new protection plates installed at the fender points.


Anti-foul applied.