Sunday, 27 June 2021

26th June 2021 - Construction Of New Storage Box



Caterogy: Fixtures & Fittings

Maintenance/Repair Details: Lifejacket Locker - removed, rebuilt and replaced the old heavy locker with a new lighter more spacious version.

Parts and/or Items Used: Wood, Wood Preserver, Other



 

Friday, 21 May 2021

20th May 2021 - Installation Of New Wheelhouse Cross Deck

Category: Fixtures & Fittings

Maintenance/Repair Details:
Something completely different as far as maintenance today. We had an idea to make sitting or viewing while underway a bit easier for our passengers by installing a new deck piece on the same level as the engine cover height. To do this required fitting two new supports either side of the aft cabin door, against the engine cover side panel, strong enough to take the weight of a person sitting or standing on the new deck cover in it raised position. The new supports were made, stained, drilled and installed.

Parts and/or Items Used: Wood, Other


Original deck level 

New side supports made and fitted.

New deck insert manufactured, covered and installed. 





Monday, 17 May 2021

17th May 2021 - Refurbishment Of Engine Morse Controls

Category: Fixtures & Fittings

Maintenance/Repair Details:
For a long time I have looked at the throttle control area and planned to improve the area. We stated in the previous entry how we sorted out the morse control and now have continued the work by massively improving the area.

The old plastic leather effect covering which was glued completely around the morse control was cut across the joint of the unit, it came away from the origin wood backing easily. The re-exposed wood was stripped of old glue, sanded back and several coats of wood stain applied. A new wood strip was cut, also stained and fixed to cover the area where the covering was cut.

General tiding of the area carried out, step back and admire the job.

Parts and/or Items Used: Wood, Wood Preserver



Tuesday, 4 May 2021

4th May 2021 - Started Work On Morse Controls

Category: Fixtures & Fittings

Maintenance/Repair Details:
Have at long last tackled the issue of a pitted and unsightly morse throttle control. Thoroughly rubbed down and cleaned it before masking up and applying a generous coat of black hammerite paint. Decided on hammered finish as the control was badly pitted. More than happy with the finish, should have done it years ago.

Parts and/or Items Used: Other Paint





Monday, 26 April 2021

22nd April 2021 - Upper Deck Cleaning

Category: Hull, Deck Work

Maintenance/Repair Details:
During the week we carried out a full scrub down and polish of upper structure, chrome work and fittings. Repaired, rubbed down and re-painted after cabin and wheelhouse edging, also saloon window surrounds.

Cleaned depth transducer housing and re-filled with clean oil.

Parts and/or Items Used: Deck Paint, Gloss Paint, Oil

Thursday, 4 March 2021

28th February 2021 - Replacement Of Wheelhouse Weather Strip

Category: Fixtures & Fittings

Maintenance/Repair Details:
Mast & weather strip restoration. Continuing the work on the wheelhouse both the mast and roof weather strip were seen to be in need of restoration or repair. The mast was removed and found to have suffered wood rot down the spine which was treated and filled to restore strength and appearance. Re-stained and re-varnished before reinstalling. The roof weather strip was found to be beyond repair with a new one fashioned, stained, varnished and refitted.

3rd March 20121 - Due to the stern light mounting being originally mounted on the weather strip I took the opportunity of making a new mount so that the stern light is mounted independently on the wheelhouse roof. Light cleaned and serviced while off the boat.

Parts and/or Items Used: Wood, Wood Preserver

New weather strip installed

     
Restored Mast



Saturday, 31 October 2020

17th October 2020

Category: Fixtures & Fittings

Maintenance/Repair Details:
Refurbishment of Wheelhouse commenced today by removing all nav instruments, handrail, fittings and covering around the helm. Wooden trimming removed and taken home for reconditioning & re-varnishing.

New battery installed in starboard bank.

31st October - Finished the revamp of the wheelhouse, recovered the helm window area with leatherette covering, rubbed down & revarnished all woodwork around the helm area, cut & varnished new edging which is fitted along the window egdes to hold the new covering firmly in place and reconnected all instrumentation.

Parts and/or Items Used:
Battery, Other, Replacement Parts, Wood, Wood Preserver

Work in progress

Covering fitted

New edging & re-varnished woodwork

Job completed


 

Thursday, 1 October 2020

1st October 2020

Category: Fuel

Maintenance/Repair Details:
To comply with recent Boat Safety Inspection I was required to remove the glass sediment bowls from each engine fuel filter and replace with all metal ones. Changed the fuel filters while I was at it.

Parts and/or Items Used:
Fuel Filters, Replacement Parts


Sunday, 13 September 2020

7th September 2020

Category: Hull, Deck Work

Maintenance/Repair Details:
Week 1: Boat lifted at Allington Marina for her annual service, anti-fouling and anode replacement. During the first week she was washed down, polished and rubbing band sanded and re-varnished. New coat of anti-foul applied. New magnesium anodes fitted as we intend on staying at Allington in fresh water.
Week 2: Area of the saloon roof which were chipped or worn away rubbed down and repainted, chrome work cleaned and fenders cleaned (removed old fender socks). General clean of interior and carpets.
Week 3: Boat safety inspection carried out (replace glass sediment fuel bowls with metal ones). Refurbish & reproof winter canopy ready for fitting.

Parts and/or Items Used:
Anodes, Anti-fouled Paint, Gloss Paint, Wood Preserver.

Tuesday, 9 June 2020

5th June 2020

Category: Hull

Maintenance/Repair Details:

Following 6 months without use due to winter lay-up and Covid19 lockdown we have carried out an underwater hull check on anodes and props. 
All appears O.K and in order.

Parts and/or Items Used: Nil.





Wednesday, 27 May 2020

17th May 2020

Category: Fixtures & Fittings

Maintenance/Repair Details:
Fitted the new summer canopy made for us by our mooring neighbour. Very light nylon canopy of a different design to the standard canopy, new zip position and much larger window.

Old canopy sent away to be renovated ready to be fitted during the winter months.
Parts and/or Items Used: Canopy





Saturday, 16 May 2020

15th May 2020


CategoryEngines, Electrics, Fixtures & Fittings, Stern Glans

Maintenance/Repair Details:
Not so much as a maintenance log more of a record of being able to return to the boat after almost 10 weeks away, due to CoVid19 virus and the national lockdown. The last time the boat was last started and used was way back in November 2019. That means she has laid dormant for almost 7 months.
Today we can visit her and do all necessary maintenance checks, in the last 10 weeks the marina has been out of bounds and inaccessible, although we are still not able to put to sea or on the river.
I am delighted to say that due to early mechanical servicing at the end of the last season the boat is in excellent condition, a little dusty inside but on checking the engines, stern glands, bilges, electrical and gas systems, she is in fine condition. Obviously, the batteries need a good charge, which we have started on our first visit and will continue when we return after the weekend.
Parts and/or Items Used: None


Tuesday, 5 November 2019

Date: 5 November 2019


Category: Hull

Maintenance/Repair Details: Following the recent service of both gearboxes I decided to complete the work by cleaning and painting the engine bays of both engines. The area was cleaned and degreased and a good coat of red bilge paint applied. An oil mat was placed under the gearboxes, more for appearance that necessity.

Parts and/or Items Used: Bilge Paint

Stbd gearbox area.

Port engine & gearbox with engine bay covers removed.








Thursday, 31 October 2019

30th October 2019

Caterogy: Gearboxes

Maintenance/Repair Details:
Replaced oil filters and gearbox oil on both gearboxes. Ran up engines and engaged drive whilst securely moored to test .
Removed UJ shaft on starboard gearbox and realigned joints for smooth running.

Parts and/or Items Used: Oil, Oil Filters


Thursday, 19 September 2019

19th September 2019

Caterogy: Engines

Maintenance/Repair Details:
Following our lift in and journey back to Chatham we identified a vibration on the port side propeller shaft. As such the double universal drive shaft from gearbox to plume bearing was removed cleaned and checked, as was all other bolts, fixtures & fittings on the port shaft. One thing highlighted by our resident engineer was the fact that the universal joint on each end may not have been alighted. Test cruise in the near future will answer that question.

Parts and/or Items Used:
Grease


Sunday, 15 September 2019

9th September 2019

Caterogy: Hull, Stern Glans

Maintenance/Repair Details:
Having been lifted out on Monday 9th September we carried out a few minor jobs before commencing anti-fouling today. First coat applied with the added extra on Extra Hot chilli powder. Also had the stern glans checked and tightened.
13th September - Adjusted stern glans and re-secured, restored aft cabin furniture. Refitted curtains & seat covers after having them cleaned. Reinflated fenders and replaced fender socks on damaged ones. Fitted new anodes. Polished hull. 
15th September - Second coat of anti-foul applied. Saloon curtains & covers refitted. Boat made ready for lift-in.

Parts and/or Items Used:
Anti-fouled Paint, Other