Monday, 20 December 2021
Winter Work - Wheelhouse Woodwork
Monday, 13 December 2021
Winter Work - Raw Water Pumps (continued)
Parts and/or Items Used: Reconditioned raw water pump.
Thursday, 9 December 2021
Winter Work - Raw Water Pumps (continued)
Category: Engines (updated as work progresses):
Commenced re-installation of both raw water pumps by installing the new pump on the port engine. What was thought to be a straightforward job turned into a 6 hour nightmare. Having struggled to install the new pump and reconnect the water pipes I realised that our engineer had fitted the pulley wheel the wrong way around. That meant dismantling all the work done to date, removing the pump, pulling the wheel off the shaft reversing it and refitting. Then the whole act of reinstalling was repeated. Having installed the pump the last thing to do was refit the alternator, easier said than done. With little room to get my hand underneath the the alternator fitting the retaining bolts was a drawn out process resulting in frequent stretching under the engine to retrieve dropped bolts, nuts or washers.
Will return and test both raw water pump and alternator in a few days time, need a couple of days off!
11th December - Raw water pump tested O.K so antifreeze pumped through the port engine cooling system, alternator function O.K. Stern gland greaser refilled. Work on the port engine now complete.
p.s have already insured the stbd pump pulley wheel is the right way around.
Parts and/or Items Used: Raw water pump.
New pump installed on port side engine.
Wednesday, 17 November 2021
Winter Work - Raw Water Pumps
Friday, 29 October 2021
Winter Work - Starboard Engine Maintenance & Raw Water Pumps
Parts and/or Items Used: Oil Filters, Drive Belt, Impeller, Replacement parts, Sound Proofing.
Exposed stbd engine (Willis). |
Stbd raw water pump & drive belt. |
Fire resistant sound proofing installed. |
Wednesday, 13 October 2021
Lift Out, Oil Change & Winterise
First task was to fix the soft area on the fore deck by drilling into the deck area from within the saloon and injecting expanding foam between the deck layers which solved the problem. Refilled and repainted the saloon roof as good as new.
Carried out oil change on both engines (oil filters arrived today but will not be replaced until both engines are fully exposed due to location of filters).
Winter canopy fitted.
The Freeman sisters. |
Saturday, 7 August 2021
7th August 2021 - Replacement Of Fridge
Maintenance/Repair Details: Replacement of fridge - following some concerns with the old Domestic RM4200 3 way fridge it was decided to finally replace the whole unit rather than pay from a reconditioning service, removal proved the right decision had been made! A few preparation had to be sorted first, selection of replacement, type of fridge, size & cost. We selected an Isotherm Elegance 65L 12/240v model so first job was to remove and blank off the old gas pipe. 240v power point was already in situ so the next job was to run 12v power from battery bay to fridge location.
Come change over day and removal of the old fridge we found the old unit was well past sell by date with extensive corrosion around the gas burner flame unit. It was obvious the right decision had been made.
The new fridge slid into place beautifully with a little bit of cosmetic work around the front edges, powered up on 240v and ran a treat. 12v wiring installed and tested, switched between power sources easily. Job complete.
Parts and/or Items Used: Replacement Fridge, Wood Preserver, Other
Sunday, 27 June 2021
26th June 2021 - Construction Of New Storage Box
Caterogy: Fixtures & Fittings
Maintenance/Repair Details: Lifejacket Locker - removed, rebuilt and replaced the old heavy locker with a new lighter more spacious version.
Parts and/or Items Used: Wood, Wood Preserver, Other
Friday, 21 May 2021
20th May 2021 - Installation Of New Wheelhouse Cross Deck
Maintenance/Repair Details:
Something completely different as far as maintenance today. We had an idea to make sitting or viewing while underway a bit easier for our passengers by installing a new deck piece on the same level as the engine cover height. To do this required fitting two new supports either side of the aft cabin door, against the engine cover side panel, strong enough to take the weight of a person sitting or standing on the new deck cover in it raised position. The new supports were made, stained, drilled and installed.
Parts and/or Items Used: Wood, Other
Monday, 17 May 2021
17th May 2021 - Refurbishment Of Engine Morse Controls
Maintenance/Repair Details:
For a long time I have looked at the throttle control area and planned to improve the area. We stated in the previous entry how we sorted out the morse control and now have continued the work by massively improving the area.
The old plastic leather effect covering which was glued completely around the morse control was cut across the joint of the unit, it came away from the origin wood backing easily. The re-exposed wood was stripped of old glue, sanded back and several coats of wood stain applied. A new wood strip was cut, also stained and fixed to cover the area where the covering was cut.
General tiding of the area carried out, step back and admire the job.
Parts and/or Items Used: Wood, Wood Preserver
Tuesday, 4 May 2021
4th May 2021 - Started Work On Morse Controls
Maintenance/Repair Details:
Have at long last tackled the issue of a pitted and unsightly morse throttle control. Thoroughly rubbed down and cleaned it before masking up and applying a generous coat of black hammerite paint. Decided on hammered finish as the control was badly pitted. More than happy with the finish, should have done it years ago.
Parts and/or Items Used: Other Paint
Monday, 26 April 2021
22nd April 2021 - Upper Deck Cleaning
During the week we carried out a full scrub down and polish of upper structure, chrome work and fittings. Repaired, rubbed down and re-painted after cabin and wheelhouse edging, also saloon window surrounds.
Cleaned depth transducer housing and re-filled with clean oil.
Thursday, 4 March 2021
28th February 2021 - Replacement Of Wheelhouse Weather Strip
Maintenance/Repair Details:
Mast & weather strip restoration. Continuing the work on the wheelhouse both the mast and roof weather strip were seen to be in need of restoration or repair. The mast was removed and found to have suffered wood rot down the spine which was treated and filled to restore strength and appearance. Re-stained and re-varnished before reinstalling. The roof weather strip was found to be beyond repair with a new one fashioned, stained, varnished and refitted.
3rd March 20121 - Due to the stern light mounting being originally mounted on the weather strip I took the opportunity of making a new mount so that the stern light is mounted independently on the wheelhouse roof. Light cleaned and serviced while off the boat.
Parts and/or Items Used: Wood, Wood Preserver