Category: Fixtures & Fittings
Maintenance/Repair Details:
Fitted the new summer canopy made for us by our mooring neighbour. Very light
nylon canopy of a different design to the standard canopy, new zip position and
much larger window.
Old canopy sent away to be renovated ready to be fitted during the winter months.
Parts and/or Items Used: Canopy
Wednesday, 27 May 2020
Saturday, 16 May 2020
15th May 2020
Category: Engines,
Electrics, Fixtures & Fittings, Stern Glans
Maintenance/Repair
Details:
Not so much as a maintenance log more of a record of being able to
return to the boat after almost 10 weeks away, due to CoVid19 virus and the
national lockdown. The last time the boat was last started and used was way
back in November 2019. That means she has laid dormant for almost 7 months.
Today we can visit her and do all necessary maintenance checks, in
the last 10 weeks the marina has been out of bounds and inaccessible, although
we are still not able to put to sea or on the river.
I am delighted to say that due to early mechanical servicing at
the end of the last season the boat is in excellent condition, a little dusty
inside but on checking the engines, stern glands, bilges, electrical and gas
systems, she is in fine condition. Obviously, the batteries need a good charge,
which we have started on our first visit and will continue when we return after
the weekend.
Parts
and/or Items Used: None
Subscribe to:
Posts (Atom)